膜结构车棚在施工时为安全要多注意
来源:http://www.sdcscp.com/ 发布时间:2022-09-01
膜结构车棚进行施工的时候,有哪些事项需要我们来注意?为了整个施工期间的各方面安全着想,下面就让小编带大家共同了解一下!
What matters need our attention during the construction of membrane structure shed? For the sake of safety in all aspects during the whole construction period, let's take you to know!
1、依据本工程制安及运送的需求,按工厂内预制和现场装置两个有些总体规划,别离编制各工序的作业指导书或技能卡;
1. According to the requirements of manufacturing, installation and transportation of the project, the operation instructions or skill cards of each process shall be prepared separately according to the two general plans of prefabrication in the factory and on-site installation;
2、在施工前5天,要安排有关部门,对施工所要运用的各种机械及设备进行全部修理,以防止在施工过程当中,机械发作毛病,影响施工;
2. Five days before the construction, relevant departments shall be arranged to repair all kinds of machinery and equipment to be used in the construction, so as to prevent mechanical faults from affecting the construction;
3、按施工安排设计需求,配齐施工所需的各种资料、用具及拉固缆风绳等;
3. According to the design requirements of the construction arrangement, provide all kinds of materials, tools and wind ropes for the construction;
4、焊接技能鉴定:对接焊缝及角焊缝焊接技能鉴定;
4. Welding skill appraisal: welding skill appraisal of butt welds and fillet welds;
5、焊工等工种进行上岗前训练,并查核合格后持证上岗;
5. Welders and other types of work shall receive pre job training and work with certificates after passing the examination;
6、一切丈量用具和设备查看、保护、送检;
6. Check, protect and submit all measuring tools and equipment for inspection;
膜结构车棚
7、在装置工程开工前,安排丈量人员,复查预埋件的纵、横轴线误差,预埋件标高,并将各列线柱的复查数据作仔细记载,将有关的数据抄送项目部负责人,技能负责人,及各施工员,施工班组。各施工组在施工中过程当中,以此数据作为构件装置调整,找正的依据。一起安排丈量人员将主拱及次拱的对接点返投在地面上,并在每个返投点上,做出丈量符号。
7. Before the commencement of the unit works, the measuring personnel shall be arranged to recheck the vertical and horizontal axis errors of the embedded parts and the elevation of the embedded parts, and the recheck data of each line column shall be carefully recorded, and the relevant data shall be copied to the person in charge of the project department, the person in charge of the skills, the construction personnel and the construction team. During construction, each construction team shall use this data as the basis for adjustment and alignment of component devices. Arrange measurement personnel to return the butt joint of the main arch and the secondary arch to the ground together, and make measurement symbols on each return point.
8、在加工结束的构件运进现场后,技能负责人安排专职人员对构件或半成品进行仔细复查(复查构件或半成品的外形几许尺度,焊缝的外观质量,及构件合格证和焊缝的探伤查看记载等),并将复查数据做仔细记载。在向下道工序转交构件或半成品时,将查看记载连同构件或半成品移送清单一起转交下道工序的施工负责人;
8. After the processed components are transported to the site, the person in charge of the skills shall arrange full-time personnel to carefully recheck the components or semi-finished products (recheck the dimensions of the components or semi-finished products, the appearance quality of the welds, the inspection records of the component certificate and the welds), and carefully record the recheck data. When transferring components or semi-finished products to the next process, the inspection records shall be transferred to the construction director of the next process together with the transfer list of components or semi-finished products;
在施工人员进入施工现场前的时候,项目部要对于该工程的首要技能特色,安排各工种施工人员进行对于性的施工技能交底。更多相关事项可以来我们网站http://www.sdcscp.com咨询了解!
Before the construction personnel enter the construction site, the project department shall arrange the construction personnel of various types of work to carry out specific construction skill disclosure for the primary skill characteristics of the project. For more information, please visit our website http://www.sdcscp.com Consult and understand!