膜结构车棚施工流程及施工前注意事项
来源:http://www.sdcscp.com/ 发布时间:2022-07-30
膜结构车棚是近年逐渐兴起的工程建筑,凭借自身特别的造型以及实用性迅速在市场上实行起来,并逐渐代替传统车棚,膜结构在施工要按照一定的流程,这些流程是保证整个膜结构安全性能的基础,小编今天就和大家讲一下膜结构车棚施工流程及注意事项。
Membrane structure shed is an engineering building that has gradually sprung up in recent years. With its special shape and practicality, it has been rapidly implemented in the market and gradually replaced the traditional shed. The construction of membrane structure should follow certain processes, which are the basis for ensuring the safety performance of the whole membrane structure. Today, I will talk about the construction process and precautions of membrane structure shed.
膜结构车棚施工流程
Construction process of membrane structure shed
检查预埋件的标高偏差与左右偏差,依据土建标高基准线测量预埋件的标高中线。整理结果,确定预埋件分隔的调整处理方案。
Check the elevation deviation and left-right deviation of embedded parts, and measure the elevation centerline of embedded parts according to the civil elevation baseline. Sort out the results and determine the adjustment and treatment scheme for the separation of embedded parts.
依据施工图放样,放样和号料时要预留加工余量和焊接收缩量,并依据放样制作样板。
Set out according to the construction drawing, reserve machining allowance and welding shrinkage during setting out and marking off, and make samples according to the setting out.
膜结构车棚的悬挂臂安装采用焊接的方法,确保各参数都准确无误后再进行焊接,检查焊接节点,调节悬挂臂的设计坡度。靠边一条悬挂臂准确无误后,安装另一边的悬挂臂,就位准确后点焊。
The suspension arm of the membrane structure shed is installed by welding, and welding can be carried out after ensuring that all parameters are accurate. Check the welding nodes and adjust the design slope of the suspension arm. After one suspension arm on the side is correct, install the suspension arm on the other side, and spot weld after it is in place.
膜结构车棚
定位预埋件的安装位置,打钻安装,要求预埋件位置准确、埋设牢固。标高偏差左右位移不大于20mm,不大于9mm。
Locate the installation position of embedded parts, drill and install. It is required that the position of embedded parts is accurate and firmly buried. The left and right displacement of elevation deviation is not more than 20mm and not more than 9mm.
膜结构车棚施工前注意事项
Precautions before construction of membrane structure shed
1、审查设计文件是否齐全、合理、符合国家标准。设计文件主要包括设计图、施工图、图纸说明和设计变更通知单等。是否经过设计、审核人员签字、校对、设计院盖章、监理单位核对,建设部门存档并由建设单位和施工单位会审签字。
1. Review whether the design documents are complete, reasonable and in line with national standards. Design documents mainly include design drawings, construction drawings, drawing descriptions, design change orders, etc. Whether it has been signed, proofread by the designers and reviewers, sealed by the Design Institute, checked by the supervision unit, archived by the construction department and jointly reviewed and signed by the construction unit and the construction unit.
2、根据工厂、工地现场的实际起重能力和运输条件,核对施工图中膜结构车棚的分段是否满足要求;工厂和工地的工艺条件是否满足设计要求。根据设计文件进行构件的详图设计,以便于产品的加工制作和安装。并编制材料采购计划。
2. According to the actual lifting capacity and transportation conditions of the factory and the construction site, check whether the sections of the membrane structure shed in the construction drawing meet the requirements; Whether the process conditions of the factory and site meet the design requirements. Carry out detailed design of components according to the design documents, so as to facilitate the processing, manufacturing and installation of products. And prepare material procurement plan.
以上是关于膜结构车棚施工流程及施工前注意事项的介绍,我公司是的生产厂家经验丰富、产品种类多样,同时可以为客户提供产品的定制服务,以满足不同工程对于产品尺寸的需要,如果您有相关产品需求欢迎来网站http://www.sdcscp.com咨询。
The above is about the construction process of membrane structure shed and the precautions before construction. Our company is a manufacturer with rich experience and a variety of products. At the same time, we can provide customers with customized products to meet the needs of different projects for product size. If you have relevant product needs, please come to the website http://www.sdcscp.com consulting service