膜结构车棚的制作步骤具体
来源:http://www.sdcscp.com/ 发布时间:2022-07-14
膜结构车棚为人们停车带来许多的便利,也广泛应用于日常生活中,那么制作膜结构车棚的步骤有哪些呢?膜结构车棚的制作步骤具体有哪些请往下面看:
Membrane structure sheds bring a lot of convenience for people to park and are widely used in daily life. What are the steps to make membrane structure sheds? Please look at the following for the manufacturing steps of the membrane structure shed:
第一点,膜结构车棚加工应该准备及下料:依据施工图放样,放样和号料时要预留焊接收缩量和加工余量,依据放样作样板。
First, the membrane structure shed processing should be prepared and blanking: setting out according to the construction drawing, setting out and marking off should reserve the welding shrinkage and machining allowance, and make a template according to the setting out.
第二点,测量放线:依据土建标高基准线测膜结构车棚预埋件的标高中心线时,检查预埋件标高偏差、左右偏差。整理结果,确定预埋件分隔的调整处理方案。
Second, measurement and setting out: when measuring the elevation center line of the embedded parts of the membrane structure shed according to the civil elevation reference line, check the elevation deviation and left-right deviation of the embedded parts. Sort out the results and determine the adjustment and treatment scheme for the separation of embedded parts.
膜结构车棚
第三点,膜结构车棚预埋件的安装处理:定位预埋件安装位置,打钻安装。要求膜结构车棚预埋件的准确位置、埋设牢固。标高偏差不大于10mm,左右位移不大于15mm。
Third, the installation treatment of the embedded parts of the membrane structure shed: locate the installation position of the embedded parts, drill and install. It is required that the embedded parts of the membrane structure shed shall be accurately located and firmly buried. The elevation deviation shall not be greater than 10mm, and the left and right displacement shall not be greater than 15mm.
第四点,膜结构车棚的悬挂臂安装焊接:悬挂臂安装采用焊接,需检查焊接节点,调节悬挂臂设计坡度,准确无误方能进行焊接。靠边一条悬挂臂准确无误后,安装另一边一条悬挂臂,就位准确后进行点焊。
Fourth, the installation and welding of the suspension arm of the membrane structure shed: the installation of the suspension arm adopts welding. It is necessary to check the welding nodes and adjust the design slope of the suspension arm. Welding can be carried out only after it is accurate. After one suspension arm on the side is accurate, install the other suspension arm, and conduct spot welding after it is in place accurately.
以上就是今天为大家介绍的关于问题以及注意事项的全部内容,希望对大家能有所帮助,想要了解更多内容可以电话联系我们或者关注我们的网站http://www.sdcscp.com,我们的工作人员会及时与您取得联系。
The above is all about the problems and precautions introduced to you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://www.sdcscp.com , our staff will contact you in time.