当前位置:首页>新闻中心-公司新闻-充电桩车棚的预埋基础应从基础开挖开始
充电桩车棚的预埋基础应从基础开挖开始
来源:http://www.sdcscp.com/ 发布时间:2022-06-22
膜结构充电桩车棚的预埋应从基础开挖开始:基坑开挖-钢筋笼安装-预埋板调整-混凝土浇筑,膜结构车棚基础的预埋是安装的第一步。整个车棚,也很重要。作为预埋基础反馈的一部分,如果基础预埋发生变化或误差过大,将及时通知膜结构公司调整产品参数以匹配基础施工误差。
The embedment of membrane structure charging pile shed shall start from foundation excavation: Foundation Pit Excavation - reinforcement cage installation - embedded plate adjustment - concrete pouring. The embedment of membrane structure shed foundation is the first step of installation. The whole shed is also very important. As part of the feedback of embedded foundation, if the embedded foundation changes or the error is too large, the membrane structure company will be notified in time to adjust the product parameters to match the foundation construction error.
充电桩车棚基础的调整和误差一般出现:有地下电缆、光缆、水管或基础不能损坏和移位;柱、梁和屋顶设计与其他建筑物或树木发生碰撞。充电桩车棚地下预埋基坑多深,一般车棚长宽深为1m*1m*1m,公交车预埋基础长宽深充电桩顶棚为1m*1m*1.5m。汽车和自行车膜结构停车棚基础开挖长、宽、深0.6米*0.6米*深0.6米即可。当然以上是一般情况,具体需要根据图纸设计和每个项目的具体情况来确定。
Adjustment and error of charging pile shed foundation generally occur: underground cables, optical cables, water pipes or foundation cannot be damaged or displaced; Column, beam and roof designs collide with other buildings or trees. The underground embedded foundation pit of the charging pile shed is deep. The length, width and depth of the general shed is 1m*1m*1m, and the length, width and depth of the bus embedded foundation is 1m*1m*1.5m. The excavation length, width and depth of the parking shed foundation of automobile and bicycle membrane structure are 0.6m * 0.6m * 0.6m. Of course, the above are general conditions, and the details need to be determined according to the drawing design and the specific conditions of each project.
膜结构充电桩车棚
充电桩车棚的基本施工标准:加工准备和切割按施工图放样,放样时要预留焊接收缩量和机加工余量和材料数量,模型按施工图制作。出发;预埋件标高中心线,检查预埋件标高偏差和左右偏差。整理结果后,确定预埋件分离的调整和处理方案;定位预埋件安装位置,钻孔安装预埋件。预埋件要求定位准确,嵌入牢固。标高偏差不大于9mm,左右位移不大于20mm。
Basic construction standard of charging pile shed: processing preparation and cutting shall be set out according to the construction drawing. During setting out, welding shrinkage, machining allowance and material quantity shall be reserved. The model shall be made according to the construction drawing. set out; Check the elevation deviation and left-right deviation of embedded parts. After sorting out the results, determine the adjustment and treatment scheme for the separation of embedded parts; Locate the installation position of embedded parts and drill holes to install embedded parts. Embedded parts shall be accurately positioned and firmly embedded. The elevation deviation shall not be greater than 9mm, and the left-right displacement shall not be greater than 20mm.
膜结构充电桩车棚的预埋基础应考虑上部结构、基础和基础的综合作用。必要时,应采取有效措施,加强上部结构的刚度和强度,以增加建筑物对地基不均匀变形的适应能力。
The composite action of superstructure, foundation and foundation shall be considered for the embedded foundation of membrane structure charging pile shed. If necessary, effective measures shall be taken to strengthen the rigidity and strength of the superstructure to increase the adaptability of the building to the uneven deformation of the foundation.
此外车棚出现损伤情况就要进行修补,假设裂缝或许破损直径小于2厘米,可以用市场常见的防水树脂胶,均匀的涂改在破损处,再在上面铺上塑料薄膜防水,这样只需经过24小的风干,这样对膜结构停车棚的修补就完成了。
In addition, if the shed is damaged, it should be repaired. Assuming that the damage diameter of the crack may be less than 2 cm, the common waterproof resin glue in the market can be used to evenly paint the damaged part, and then the plastic film is paved on it for waterproof. In this way, it only needs 24 hours of air drying, so the repair of the membrane structure parking shed is completed.
假设膜结构充电桩车棚的破损比较大就要采纳掩盖法,打磨受损有些的边际,使其平坦,用洁净的布来洁净尘埃,然后依据破损面积截图大于其面积2倍的掩盖资料如彩钢板,阳光板等,在收存边际涂改上专用强力玻璃胶,然后把车棚以面积中间受力点掩盖在受损面外表,轻轻揉捏使其接触均匀等风干以后用防水玻璃胶将接缝处涂改一遍防止水的渗漏
Assuming that the damage of the membrane structure charging pile shed is relatively large, it is necessary to adopt the covering method, polish the damaged edge to make it flat, use clean cloth to clean the dust, and then apply special strong glass adhesive to the storage edge according to the covering data such as color steel plate and sunlight plate whose damaged area screenshot is greater than twice its area, and then cover the shed with the Middle stress point of the area on the surface of the damaged surface, Gently knead it to make it contact evenly. After air drying, use waterproof glass glue to paint the joint once to prevent water leakage
以上就是今天为大家分享的关于问题的相关内容,希望对大家能有所帮助,想要了解更多内容可以电话联系我们或者关注我们的网站http://www.sdcscp.com
The above is the relevant content about the problem shared for you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://www.sdcscp.com 。